Sitio web de TYPSA, Versión imprimible.

Regional Manager
José Ramon González Pachón
Technical Manager
Jaime Ruiz Casanueva
Tecnoma has permanent offices in Andalusia since 1998, performing outstandingly in the field of applied ecology, impact mitigation measures, water engineering and forest tasks, as well as in water-quality control and monitoring. It currently has offices in Seville and Málaga and an environmental lab in Seville.

Tecnoma Andalusia has a vast experience in the field of environmental impact assessment and mitigation measures, having taken part in the Region’s largest development projects and works. It is worth highlighting its Works Management for correction measures and environmental consulting for works at the Jerez – Los Barrios 381 Motorway, which received the "Global Road Achievement Award" from the International Road Federation in terms of environmental interventions.

It also has great experience in flora and fauna surveys and their monitoring, having carried out censuses, prospections and samplings, both of terrestrial and water fauna.

Tecnoma has an environmental analysis lab in Mairena de Aljarafe (Seville). This lab is equipped with the latest analysis equipment and has highly-qualified and experienced personnel, thus it is possible for us to offer a wide range of analysis-related services. The lab also has an internal quality-control program, within which different cross-comparison test circuits take place, including the international program from the Water Research Center, Aquacheck.

ANDÉVALO DAM

The task carried out was basically technical assistance, surveillance, monitoring and environmental control of works.

It is a rockfill dam with a clay core, 1,862 meters long and 62 m tall. Total catchment area is 738 km2 and reservoir volume is 600 hm3.

Environmental surveillance tasks included the following:

  • Environmental surveilland and restoration program.
  • Research program: effects on sensitive species (lynx and black vulture, among others).
  • Preparing specific surveys on environmental damage and/or impact.
  • Coordination with Andevalo Dam’s Environmental Monitoring Commission.

LA BREÑA II DAM

Technical assistance, Coordination, Inspection and Control, and Surveillance of works related to Groups II and III (breeding interventions, handling of fauna and vegetation, and implanting facilities of plots 1, 2, 3, 7, 14 and 15) concerning the first alteration of the project towards compensating affected land areas and corrective measures to build the dam. ACUAVIR, S.A.
 
Contact | Legal information | Office Network | ©2008 TYPSA Group