Sitio web de TYPSA, Versión imprimible.

 

The fields of activity in the area of Environmental Quality are:

CASTILLA Y LEON COMPREHENSIVE WASTE PLAN

Castilla y Leon Region Comprehensive Waste Plan (2010 – 2015). The Plan includes the review of existing plans by sector and includes the planning of the management of urban waste and packaging, hazardous and non-hazardous industrial waste, silt from filters, and construction and demolition site waste. The works include an intensive diagnostic campaign to have real and contrasted information available.

 

SOIL POLLUTION RISK ASSESSMENT IN CASTILLA Y LEON

This specialized technical assistance was supplied to the Castilla y Leon Regional Government Ministry of the Environment, for locations with contaminated soils that require a detailed study of the risks associated to pollution and action for decontamination.


MEASURING AND MODELLING OF NOISE POLLUTION. GETAFE

TECNOMA carried out a campaign of noise measurement and modelling within the framework of the Town Planning Proposal in the area of non-consolidated urban land in the municipality of Getafe. The possible noise effect of an industrial area, a railway line and motor traffic in the surrounding area were studied, and necessary corrective measures proposed.
 
Contact | Legal information | Office Network | ©2010 TYPSA Group